How a Lancashire Printing Factory Saved £6,000 a Month with Solar Installation.
Client Overview
Client - First 4 Printing - Printing Company
Location - Great Harwood, Lancashire
Building - Industrial Factory unit.
Energy Pattern - Heavy daytime load from industrial printing machines.
The Challenge
Rising energy bills were a growing concern as high powered printing equipment ran daily. The business was spending thousands of pounds each month on electricity alone. They needed a smarter, more sustainable way to take back control.
The Solution
We installed:- 95.7 kWp
Panel count:- 220 panels (435w each)
Installation time:- 7 days
Design: - optimized for factory load profile.
Annual Production
79,814 kWh
Monthly Savings
£6,200
Payback Period
1.5 years
Lifetime savings
£2,900,000
Client Testimonial
"We're extremely happy with the results.
The installation was fast; the service was professional, and we're seeing immediate savings.”
Contact Us
0333 188 5855
Sales@OakdaleRenewables.co.uk
Blackburn Rovers Enterprise Ewood Park Blackburn BB2 4JF